-->
اكتب ما تود البحت عنه و اضغط Enter
معذرة، فالصفحة التي تبحث عنها في هذه المدونة ليست متوفرة.

الأحد، 17 أبريل 2016

The High Dam should serve to produce hydro-energy as a basis for the
industrialization of the country. Twelve turbines to be installed in lateral
outlets of the dam together with others at the old Aswan Dam were to
produce 10 billion kWh of electric energy annually. As part of the strategy
a huge industrial complex was to be created in the region of Aswan.
The gigantic project was not only of great importance for international
politics, as shown above, but also for Egyptian domestic politics during the
time of Nasser. In the course of the sixteen years of his rule, Nasser created,
through intensive propaganda for the Sadd el-Ali among his people, the vision
of a new Egypt of great agrarian productivity which would catch up with
the industrialized countries – thanks to plenty of cheap energy produced at
the High Dam.
The current picture as regards the realization of Nasser’s goals is as
follows

شارك الموضوع عبر :

كاتب الموضوع :

ليست هناك تعليقات:

إرسال تعليق

بث مباشر

انتظروا البث المباشر للإجابة على تساؤلاتكم

730

بتوقيت مصر

830

بتوقيت مكة المكرمة

مدونة بحث علمي
مدونة بحث عملي تهتم بطرح العديد من البحاث العلمية و المواضيع المهمة و المفيدة التي يحتاجها كل مدون و او مصمم و كل شخص باحث عما يفيده في احتياجاته لتطوير انفسة او البرامج التي يبحث عنها اصحاب مجالات المختصة في جميع التخصصات المختلة هدف الموقع تقديم الخدمات و المساعدات في التطوير و التصميم و كل شئ تقريبا و حظا موفق مدونة بحث عملي
للإتصال بما :Ahmedragab9497@gmail.com
جميع الحقوق محفوظة ل famous egypt

تصميم و تكويد   احمد رجب